K. Male'
|
15 Jan 2023 | Sun 18:33
MTCC wraps up Sh. Noomaraa harbor and channel dredging project
MTCC wraps up Sh. Noomaraa harbor and channel dredging project
MTCC
Maldives Transport and Contracting Company
MTCC wraps up Sh. Noomaraa harbor and channel dredging project
 
This was revealed by the Maldives Transport and Contracting Company (MTCC) on Sunday
 
MTCC conducted maintenance dredging operations of existing harbor basin
 
The project was mobilized on 15 December 2022

The harbor and channel dredging project in Noomaraa island of Shaviyani atoll, has been completed.

This was revealed by the Maldives Transport and Contracting Company (MTCC) on Sunday.

As such, the company revealed that they wrapped up the Noomaraa harbor and channel dredging project on January 15.

Under the scope of the project, MTCC conducted maintenance dredging operations of existing harbor basin and surveying works measuring an area of 6,347 cubic meters.

The project was mobilized on 15 December 2022.

In a meeting held with the island council back in June last year, President Ibrahim Mohamed Solih assured the island community that the administration will accord priority to alleviate the challenges and issues faced in utilizing the island harbor.

As part of the administration’s development vision, MTCC has been successfully carrying out and wrapping up a number of development projects across different parts of the island nation.

Last updated at: 1 year ago
Reviewed by: Fathimath Zuhaira
0%
0%
0%
0%
0%
0%
comment