“Rock boulders are en route”: still gov’t’s go-to line three years on
26 ނޮވެމްބަރު 2026 | ބުރާސްފަތި 16:49The government has faced mounting criticism for repeatedly attributing the suspension of infrastructure projects in the Maldives to a shortage of boulders. Although importing materials from India remains a viable option, the administration continues to justify the delays by citing financial constraints and the ongoing conflict in the Middle East. After three years, a permanent resolution remains elusive, leaving numerous development projects at a complete standstill


A shipment of rock boulders | MTCC
Ever since 2024, high-ranking members of the administration have repeatedly pointed to supposed obstacles in acquiring rock boulders as the main culprit behind stalled and delayed infrastructure initiatives nationwide.
Despite officials recycling this exact excuse in different variations for three consecutive years, it is growing harder to ignore that an actual lack of boulders is not the real problem. Rather, mounting evidence points squarely to the administration’s own mismanagement and incompetence as the true driver behind the complete lack of progress.
Tracing the history of President Dr. Mohamed Muizzu’s administration alongside its evolving boulder excuses reveals a clear pattern of broken timelines.
During a trip to F. Feeali on 16 February 2024, the president promised locals that rock boulders would be sourced for their island, yet 18 months later, nothing had materialized. In a similar vein, officials declared on 21 September 2024, that construction would kick off immediately once imminent boulder deliveries arrived.
Come January 2025, the story changed, with President Muizzu attributing the hold-ups to budget shortfalls and associated hurdles, while simultaneously insisting that his administration had already locked down the financing needed to bring in bulk shipments for every island requiring them.
Even after those assurances, officials spent August and September 2025 once again blaming sluggish deliveries for the halt in harbor developments and land reclamation works. Then, on 12 October 2025, the state publicized the unloading of an initial 56,450-tonne bulk cargo brought in through MTCC. However, even after MTCC committed to importing 2.5 million tonnes before the close of that year, outer-island developments continued to suffer from the exact same material deficits.
By 2026, officials introduced an entirely fresh angle to their repertoire of excuses by pointing to Middle Eastern hostilities and the blockade of the Strait of Hormuz. Even though that regional conflict primarily drove up worldwide oil and gas costs, the administration somehow stretched it to explain away domestic rock boulder shortages.
In June 2026, Minister of Construction and Infrastructure Dr. Abdulla Muththalib acknowledged that acquisition troubles were still holding back projects, though he promised that supply deliveries would smooth out starting that very month. Predictably, however, by October and well into late November 2026, Minister Muththalib was back to claiming that harbor and infrastructure works were still frozen because of wartime supply chain bottlenecks.
This narrative pushed by both the President and Minister Muththalib clashes sharply with the reality that India continues to serve as the Maldives' chief source of aggregate and rock. Regardless of how government figures previously treated New Delhi, India has extended an extraordinarily generous export quota for building materials to the Maldives, larger than what it offers any other nation.
Because the trade route for bringing in supplies from India remains completely unobstructed, widespread skepticism has grown, with observers viewing the references to Middle Eastern warfare and the Strait of Hormuz as nothing more than a convenient smokescreen to hide domestic governance failures.
Perhaps the greatest irony, and the main reason this narrative has become a punchline among the public, is just how copy-pasted the official talking points have become. Starting from the 2024 assurances of imminent boulder arrivals, moving to the 2025 declarations that financing was in place for massive bulk orders, the script remained virtually untouched in November 2026, when Minister Muththalib once more vowed that the boulder shortage would be fixed sometime over the next year.
Across three whole years, even as the scapegoats morphed from cash shortages to foreign wars, the state's bottom line never budged: development remains frozen for want of boulders and the real fix is perpetually pushed off until next year.









